- Services
- |
- Special Projects
- |
- Safety
- |
- Planroom
- |
- Contact Us
- |
- About Us
Spring Lake Park, MN
1481 81st Ave NE
Spring Lake Park, MN 55432
763.786.9800 Fax: 763.786.2952
Estimating: FAX 763.786.2952
Spring Lake Park, MN 763.786.9800
Grand Forks, ND 701.795.6994
Watford City, ND 701.842.2188
Pipe and Utility installation requires experienced pipe layers as well as utilizing the right equipment. In order to ensure Park Construction Company crews are meeting safety and environmental regulations, our project managers and field staff are trained in all the latest methods and procedures to meet the specifications and standards of every aspect of the job.
We install the following underground utilities:
| Project Location: | City of Eagan |
|---|---|
| Location: | Eagan, MN |
| Completion Date: | November 2008 |
This project entailed street and utility improvements for the city of Eagan, MN. The existing two lane road was transformed into a four lane divided highway. Park Construction Company was responsible for all removals on the project, as well as the excavation of over 140,000 cubic yards. In addition, Park Construction Company installed approximately 2½ miles of storm sewer. As the prime contractor, Park Construction Company was also responsible for scheduling utilities and subcontractors in order to meet the required completion dates. Major subcontractors involved in this project included electrical, erosion control/landscaping, concrete curb and gutter, bituminous paving, and retaining walls. The contract was administered by the city of Eagan as well as the Minnesota Department of Transportation.