Molding the Earth takes on its most visible form in heavy earth moving. When the job requires dirt moving - whether 50 cubic yards or five million cubic yards, Park Construction Company can complete it quickly and smoothly.
Park Construction Company can complete a wide range of earthmoving work from mass excavation to the small detail work in golf course construction.
| Project Location: | 11 miles east of Douglas, WY |
|---|---|
| Location: | Fisher to Bona, WY |
| Completion Date: | July 31, 2008 |
List of Self-Performed Work:
The first major activity was the construction of 11 miles of railroad subgrade. This work would require Park Construction Company to excavate to embank over 54,000 cubic yards (CY) of earth material. The second phase was the installation of over 2,000 LF of corrugated metal pipe (CMP). The majority of this CMP was larger than 36Ó in diameter with the largest pipe having a diameter of 12 feet. The final phase of construction was the installation of 7 precast concrete bridges. These bridges all required earthwork accomplished by Park Construction Company. In addition to the precast bridges two metal bridges were constructed.